From drawing to handover
How a Shamuna pre-engineered building comes together.
Our process
- Design and drawingsFrames are designed for your area, height and loads before fabrication starts.
- FabricationPrimary frames, Z and C purlins, girts and eave struts are made in the factory.
- Sheeting and accessoriesColour-coated roof and wall panels, turbo ventilators and mezzanine floor parts.
- DispatchParts are packed and sent to your site in erection order.
- ErectionFrames are lifted, bolted and sheeted on site.
- HandoverFinal checks and handover to you.
What happens and what we need from you
| Step | What we do | What we need from you |
|---|---|---|
| Brief | Ask about use, area, eave height and location | A site sketch or drawings |
| Design and quote | Design the frames and prepare a quotation | Review and approve |
| Fabrication | Make and mark the parts | Foundation work on site |
| Dispatch | Send parts in erection order | Truck access to site |
| Erection | Lift, bolt and sheet the frames | Working space and crane access |
| Handover | Final checks | Sign-off |
Quick answers
Who prepares the foundation?
In most PEB projects the foundation is built on site to anchor-bolt drawings from the manufacturer. Confirm who does what in your quotation.
Can foundation and fabrication happen together?
Yes. Parts are made in the factory while your foundation is prepared, which saves time.