Get a quote

Pre-Engineered Buildings

Steel frames designed and fabricated in the factory, then erected on site. Cost effective, sturdy and quick to build.

A PEB swaps many on-site tasks for factory-made steel parts. The frame is shaped to your span and loads, so steel is placed where the building needs it, which keeps weight, cost and build time in check.

Made in
Factory, then bolted on site
Typical use
Factories, warehouses, sheds
Ask us for
Frames sized to your loads

What to tell us

  • The clear span and bay spacing you want
  • Eave height, plus any crane or racking loads
  • Your site location, so wind and rain loads are right

Ask about Pre-Engineered Buildings

Pre-Engineered Buildings by Shamuna Structures

Used in

A pre-engineered building (PEB) is a steel building whose frames, purlins and sheeting are designed and made in a factory, then bolted together on your site. Shamuna Structures builds PEBs in Bengaluru with 25+ years of experience and 90+ completed projects.

Made in
Factory, bolted on site
Typical use
Factories, warehouses, sheds
Sizes we have built
10,000 to 78,000 sq ft
Experience
25+ years, 90+ projects

About Pre-Engineered Buildings

Shamuna Structures designs and builds pre-engineered buildings (PEBs) for factories, warehouses, workshops, showrooms and other buildings that need a wide, open floor. Each building is designed for your area, height and loads, made in the factory and bolted together on site.

This page explains how a PEB is made, which frame types are common, what it offers and how to ask for a quotation.

Parts of a PEB

PartWhat it doesShamuna product
Primary framesColumns and rafters carry the main loadsPre-Engineered Buildings
Secondary membersPurlins, girts and eave struts hold the sheetingZ & C Purlins
SheetingColour-coated steel roof and wallsRoof & Wall Panels
VentilationRoof ventilators let hot air outTurbo Ventilators
Extra floorA working level inside the buildingMezzanine Floors

How a PEB is built

  1. BriefArea, clear span, eave height, use and site location.
  2. Design and quoteFrames are sized for your loads. You approve the drawings.
  3. FabricationParts are made in the factory while your foundation is prepared.
  4. DeliveryParts arrive in erection order.
  5. ErectionFrames are lifted and bolted, then sheeting, doors and ventilators are fitted.
  6. HandoverFinal checks, then the building is yours.

Where PEBs work well

  • Factories D.R. Polyspinners, Doddaballapura, 78,000 sq ft
  • Warehouses Achala Warehouse, Aduru, 48,500 sq ft
  • Industrial units Sapthagiri Industries, Kollegala, 54,000 sq ft
  • Smaller sheds Doctor Pack, Bommasandra, 12,200 sq ft

PEB or conventional construction

PointPEBConventional
Main workIn a factory, bolted on siteOn site: concrete, formwork, masonry
DesignComplete before fabricationOften developed during the build
Wide spansColumn-free floors are commonUsually need a heavier structure
Extending laterAdding bays is usually simpleDepends on the structure

Multi-storey, unusual shapes or very heavy loads may need a mix of systems. Ask for a written comparison for your site.

What sets the cost

  • Area and shape A simple rectangle is easier to build than a complex plan
  • Clear span Wider column-free floors need deeper frames
  • Eave height Taller walls need stronger columns and more sheeting
  • Loads Wind, roof load, cranes, racking and solar panels change frame sizes
  • Sheeting Single skin or insulated panels, and your colour choice
  • Extras Doors, skylights, ventilators, mezzanine floors, gutters
  • Site access Trucks, cranes and foundation design

Send us this for a quote

  • Building type and use
  • Approximate area in sq ft, or width and length
  • Eave height you need
  • Site location, with a site plan if you have one
  • Cranes, racking or heavy equipment
  • Colours, insulation, skylights or ventilators
  • Target start date

Choosing a PEB manufacturer

  • Completed projects of similar size and use, ideally one you can visit
  • A quotation that lists what is included and what is not
  • The design loads and standards in writing
  • A schedule with dates
  • Clear after-sales contact
  • Clear answers to your questions before you order

Care and upkeep

  • Inspect roof sheets, fasteners and gutters yearly and after heavy storms
  • Keep gutters and downpipes clear
  • Check bolts and connections for looseness
  • Touch up chipped coatings early
  • Confirm the frame can carry any later extra load, such as solar panels or a mezzanine

Common frame types

TypeShapeSuits
Clear spanOne wide frame, no inner columnsWarehouses and factories that need open floors
Multi-spanFrames with inner columnsVery wide buildings
Multi-gableSeveral roof peaks side by sideWide buildings with drained roofs
Lean-toRoof attached to an existing wallExtensions and side sheds
Mono-slopeOne roof slopeCanopies and small sheds
With craneFrame with crane bracket or beamFactories and workshops using cranes

Ask us which frame suits your site and loads.

Advantages

Shorter buildparts are made while your foundation is prepared
Sensible use of steelframes are shaped to the loads they carry
Wide open floorsclear spans keep the floor free
Easy to extendbays can be added later
Tidy siteparts arrive marked and ready to fit
Low upkeepcoated steel needs routine checks and touch-ups

Why choose Shamuna

Experience25+ years in steel buildings
Track record90+ projects, 10,000 to 78,000 sq ft
Qualityinternational quality standards
Deliveryon-time delivery and fast, exact execution

Frames on our sites

Frames and purlins going up on site
Frames and purlins going up on site
Primary frames with bracing
Primary frames with bracing
Portal frames before sheeting
Portal frames before sheeting

Quick answers

What is a pre-engineered building?

A PEB is a steel building whose parts are designed and made in a factory and assembled on site. This makes construction faster and more predictable than building mostly on site.

How long does it take to build a PEB?

It depends on size, design and site access. Parts are made while your foundation is prepared, so the schedule is usually shorter than for a building formed mostly on site. Ask for a dated schedule with your quotation.

What sizes does Shamuna Structures build?

Our listed projects range from 10,000 sq ft to 78,000 sq ft.

Can a PEB be extended later?

In most cases yes. Bays can be added if this is planned at the design stage.

Can I add a mezzanine floor?

Yes, over the full floor or part of it. Share the loads it must carry.

Does Shamuna Structures work outside Bengaluru?

Yes. Our projects include Mysuru, Tumakuru, Kollegala, Shoolagiri and Vellore.

How do I get a PEB quotation in Bengaluru?

Send the quote form or call +91 99000 61443 with your building type, area, eave height and site location.

Is a PEB strong enough for heavy loads?

Frames are designed for the loads you specify, such as roof, wind, cranes and racking. Share them early so the design is right.

Can a PEB have a crane?

Yes. Give us the crane capacity and runway length and the frame is designed for them.

Last reviewed 20 November 2026 by Shamuna Structures, Bengaluru.

Explore more

Why buyers trust Shamuna

Experience
25+ years
Projects
90+ completed
Named projects
26 listed with size
Based in
Chikkabanavara, Bengaluru

Visit or call: Kereguddadahalli, Chikkabanavara, Somashetti Halli, Bengaluru, Karnataka 560090 | +91 99000 61443 | +91 96323 22826 | naveen@shamuna.in

Have a site in mind?

Start your quote
Chat on WhatsApp
CallWhatsAppGet a quote